RAMS Builder

From recycled documents to RAMS written for this job.

Workflow illustration

Workflow illustration, not a real job or site. Known job and site data, the site team's answers to focused questions about the work, environment, access and conditions, and project drawings form the job context. RAMS Builder selects only the relevant risks from the approved risk library, drafts the risk assessment with mitigations and the method statement, and flags a high-risk point. An authorised reviewer approves and signs off, producing the controlled RAMS document with its approval record.

People stay in control

A project manager or other authorised reviewer remains accountable for the document. The application supports structured drafting and consistency; competent safety judgement, review and formal sign-off stay with people.

The challenge

RAMS are essential, but producing them had become repetitive. Project managers often started from an old document, copied sections across and edited the risks, methods and site details to fit the next job. That took time and created a quality problem: copied content could leave irrelevant risks in place, while site-specific circumstances could be missed.

What we built

RAMS Builder replaces the blank-page and copy-and-paste stages of RAMS preparation. It starts from known job and site information, asks focused questions about the work, environment, access and conditions, and draws on an approved risk library, mitigation rules, templates and method knowledge to assemble a job-specific draft. Drawings and project documents add context where relevant.

High-risk points are surfaced for attention before the document moves to an authorised reviewer for approval and sign-off.

What it connects

  • Job and site data
  • Approved risk library and mitigation rules
  • RAMS template and method knowledge
  • Project drawings and documents
  • Answers from the project or site team

The difference it makes

  • Project teams spend less time copying, deleting and reworking material from previous RAMS.
  • Focused questions, project information and approved safety knowledge make each draft reflect the actual work and site conditions.
  • High-risk points and unusual conditions are put in front of the reviewer rather than buried in a recycled document.
  • The draft, review, approval record and final controlled document stay in one workflow, leaving reviewers more time for safety judgement.

Business profile

Team
Project management and site teams
Workflow
RAMS drafting, review and sign-off

Job-specific drafting from approved safety knowledge, with competent review and formal sign-off kept with authorised people.

Inputs and outputs

Inputs

  • Job and site data
  • Approved risk library and mitigation rules
  • RAMS template and method knowledge
  • Project drawings and documents
  • Answers from the project or site team

Outputs

  • Job-specific risk assessment
  • Method statement
  • High-risk summary for the reviewer
  • Approval record
  • Final controlled RAMS document