Put machine knowledge where operators need it

29 August 2026

Turn patchy prospect records into sales-ready account intelligence

29 August 2026

REAL-WORLD AIMAI APPLICATION

Build job-specific RAMS without the copy-and-paste routine

AIMAI built a RAMS Application that turns job details, site information, drawings and approved safety knowledge into a structured, job-specific risk assessment and method statement for competent review and sign-off.

The impact

Cut the copy-and-paste burden

Project teams spend less time copying, deleting and reworking material from previous RAMS documents.

Make the RAMS about this job

Focused questions, project information and approved safety knowledge make the draft reflect the actual work and site conditions.

Put high-risk points in front of the reviewer

Important risks and unusual conditions are surfaced for attention rather than buried in a long recycled document.

Keep review and sign-off connected

The draft, review, approval record and final controlled document stay connected to the same workflow.

The problem

RAMS are essential, but the process of producing them can become repetitive. Project managers often start from an old document, copy sections across and then edit the risks, methods and site details to fit the new job.

That takes time and creates a quality problem. Generic or copied content can leave irrelevant risks in the document, while important site-specific circumstances can be missed.

What the Application does

AIMAI built the Application to replace the blank-page and copy-and-paste stages of RAMS preparation. It starts with known job and site information, asks focused questions about the work, environment, access and conditions, and uses an approved risk library, mitigation rules, templates and method knowledge to assemble a job-specific draft. Drawings and project documents add context where relevant. High-risk points are surfaced for attention before the document moves to an authorised reviewer for approval and sign-off.

How it works

  1. Known job and site information loaded
  2. Focused questions capture site-specific conditions
  3. Relevant risks selected from approved knowledge
  4. Mitigations and method statement drafted
  5. High-risk points highlighted for review
  6. Authorised reviewer approves and signs off the final RAMS

What it uses

  • Job and site data
  • Approved risk library and mitigation rules
  • RAMS template and method knowledge
  • Project drawings and documents
  • Answers from the project or site team

What it produces

  • Job-specific risk assessment
  • Method statement
  • High-risk summary for the reviewer
  • Approval record
  • Final controlled RAMS document

Where people stay in control

A project manager or other authorised reviewer remains accountable for the document. The Application supports structured drafting and consistency, but it does not remove the need for competent safety judgement, review or formal sign-off.

The result

The project team starts from a structured, job-specific RAMS draft rather than recycling a previous document. Reviewers can spend more of their time on safety judgement and unusual conditions, with approval and the final controlled document kept in the same workflow.

Could something similar work in your business?

It is likely to be relevant if:

  • Your team produces RAMS frequently or at meaningful volume.
  • Project managers routinely start from old documents and edit them for the next job.
  • Generic templates leave irrelevant content that has to be removed manually.
  • Useful job information already exists across project data, drawings or documents.
  • Human review and accountable sign-off must remain part of the process.

Have a workflow like this?

Tell us how your team creates and approves RAMS today. If the process has similar job data, safety knowledge and review stages, we can show you how an Application could be configured around your workflow.

Explore it with AIMAI